Week 17
This week the shop flooded. With all of the weather we have been having, a drain outside clogged, and a bunch of water came in through the garage door. This basically killed all productivity for wednesday, but the week wasn’t too bad. This week I did the first test of the piston action inside the tube, which was fairly sucessful, with some minor hiccups.
This week was all about getting the piston to be tested, which meant attaching the nut, and nutplate.